CF Industries AM5 Civil & Structural Upgrades
- This project included lifting an 85,000 lbs Substation building with a 500-ton crane (over existing buildings) and placing it on top of 9 ft concrete piers that Moore’s Team installed.
- Moore demoed the existing buildings and then self-performed the new foundation work and new steelwork, including leveling channels for new switchgear, miscellaneous cable tray supports, bulkhead steel, and a new double door with transom.